ABC Builder eNews | American Buildings Company
 
Logo
April 2021
Attend one of Our Builder and Erector Schools!

ShakeoutPro Update Now Available

image

An update to the ShakeoutPro app has recently launched for both Apple and Android devices. The update includes a new feature that allows multiple phases loaded and active at one time. In addition, iOS 14 is now fully supported, and software and codebase have been updated to the latest versions.

Read Here

American Innovative Structures Completes Training and Hangar Facility 

image

An ABC custom pre-engineered metal building was chosen for this new training facility and hangar for the EVA Flight Training Academy. The 17,430 square-foot facility, located at the Mather Airport, Mather, CA, utilized ABC’s Standing Seam 360 roof panel. 

Read Here

Partial Height Portal Frames Option Explained

image

Using a partial height portal frame instead of a full height portal frame can be utilized by switching to x-bracing above the portal frame. In this month’s Tips From Engineering, this solution is described.

Read Here

eQuote Update Scheduled

image

There is an eQuote update scheduled for April 8, 2021, from approximately 10 p.m. to 11:30 p.m. Eastern Standard Time. The site will be unavailable during this update.

Read Here